Various manufacturers, such as ASUSO - Büchner - Jansen - MEYER - Pigrol - Pufas et al.
SCHULLER Mercato 20 30 40 50 60 80, flat paintbrushFlat paintbrush for primers, glazes, water- and solvent-based paints. Bright bristle, yellow handle, galvanized bracket. Delivery period: 3 working days
Delivery weight: 0.2 kg
|
KOBAU Reno fleece 150 repair fleece wallpaper, 25mFleece wallpaper for surface renovation or crack bridging for smooth, wallpaper-ready or paintable surfaces indoors.
1 m² = 1.55 €
Delivery period: 3 working days
Delivery weight: 3 kg
|
GOLD PACK Classic protective masking fleece, 50mProtective cover fleece against dirt and damage, foil laminated, non-slip and absorbent, reusable. Delivery period: 3 working days
Delivery weight: 10.5 kg
|
KIP fine masking tape 3X 301 experts set , 30mmSet of 3 rolls (30mm / 50m) professional painter crepe tape, teaproof and moisture resistant for smooth surfaces.
1 m = 0.09 €
Delivery period: 3 working days
Delivery weight: 0.3 kg
|
KIP Fine-Line Tape 3808 30mm, 3pc. SetSet of 3 rolls (30mm/50m) masking tape against slipping in, for straight edges on smooth and slightly rough surfaces.
1 m = 0.12 €
Delivery period: 3 working days
Delivery weight: 0.3 kg
|
MEYER boiled linseed oilWood sealer made of natural linseed oil with the addition of drying agents. Twice boiled and resin free.
1 l = 3.02 €
Delivery period: 3 working days
Delivery weight: 6 kg
|
MEYER Tiefgrund Makrylat LFSolvent-free, ready-for-use primer with good permeation characteristics, reduces high absorbency of the surface.
1 l = 7.96 €
|
MILACOR magnetic paintWith Milacor's matte gray, solvent-free magnetic paint, wall surfaces can be converted into a magnetic wall at quick and easy. |
JANSEN glossy radiator lacquer, whiteWhite, glossy heat resistant coating for steam radiators and hot water heating radiators of all systems.
1 l = 39.87 €
|
GEIGER Chemie No.26 zinc and alloy detergentThe product is used for cleaning, degreasing and pretreatment of galvanized parts / surfaces
1 l = 19.80 €
Delivery period: 3 working days |
21 - 30 of 40 results |
|